Contract No. C340B – Main Works for Barra Station, Macau LRT

Project Description: Ozzo was asked to execute the temporary traffic management schemes (TTMS) and temporary road works (TRW) design required for the Barra Light Rail Station in Macau. It is now expected that the station will be completed and opened in 2023 Projects: Contract No. C340B – Main Works for Barra Station, Macau LRT Project…

Development of an Animal Welfare Centre Government Land on Cheung Fai Road, Tsing Yi

Project Description: Ozzo was commissioned to provide the traffic engineering design on the public lay-by, carpark design, new run in/out for the new Animal Welfare Centre at Tsing Yi. Projects: Development of an Animal Welfare Centre Government Land on Cheung Fai Road, Tsing Yi Project Type: Engineering Design and Study Project Year: 2020-2022 Ultimate Client:…

Temporary Traffic Management Scheme for Façade Shoring Works at Block 4 in Central Police Station

Project Description: Block 4 is one of 16 historic buildings of Central Police Station (CPS). The recovery work for Block 4 comprises demolition works, steel façade shoring works and the main contract works. As Block 4 is located next to Arbuthnot Road, traffic on Arbuthnot Road will have to be properly managed during the process…

Provision of Consultancy service for Robotic System Testing in Tseung Kwan O Industrial Estate

Project Description: Ozzo was commissioned to provide TTM Scheme and Traffic Impact Assessment Report for Robot System for the Placement and Collection of Traffic Cones and Lanterns in Road Works in Tseung Kwan O Industrial Estate. Projects: Provision of Consultancy service on design of TTM Scheme and Traffic Impact Assessment Report for Robotic System Testing…

Contract No. C340B – Main Works for Barra Station, Macau LRT

Project Description: Ozzo was asked to execute the temporary traffic management schemes (TTMS) and temporary road works (TRW) design required for the Barra Light Rail Station in Macau. It is now expected that the station will be completed and opened in 2023 Projects: Contract No. C340B – Main Works for Barra Station, Macau LRT Project…

Contract No. HY/2009/08, Widening of Tolo Highway/ Fanling Highway between Island House Interchange and Fanling

Project Description: To meet the increasing traffic needs of the Tolo and Fanling Highways, Ozzo was asked to assess prior traffic conditions, provide temporary traffic arrangements to facilitate, the widening construction on both Tolo and Fanling Highways. Projects: Contract No. HY/2009/08, Widening of Tolo Highway/ Fanling Highway between Island House Interchange and Fanling Project Type:  Temporary…

Provision of Consultancy service for Robotic System Testing in Tseung Kwan O Industrial Estate

Project Description: Ozzo was commissioned to provide TTM Scheme and Traffic Impact Assessment Report for Robot System for the Placement and Collection of Traffic Cones and Lanterns in Road Works in Tseung Kwan O Industrial Estate. Projects: Provision of Consultancy service on design of TTM Scheme and Traffic Impact Assessment Report for Robotic System Testing…

Section 16 Planning Application for Proposed Temporary Shop and Services (Convenience Store and Showroom) and Storage Use at Au Tau, Yuen Long

Project Description: Ozzo and Toco have successfully seeks the permission of the Town Planning Board in within 2 months to allow the provision of a retail shop and convenience store, showroom for the Intelligent Traffic System (ITS) facilities, storage of temporary traffic management implementation services at Au Tau, Yuen Long. Projects: Section 16 Planning Application for…

Traffic Impact Assessment for the Project of 053WS – “Uprating of Chai Wan Salt Water Supply System”

Project Description: Chai Wan salt water supply system has nearly reached the designed capacity limit, so the system must be upgraded in order to provide adequate and reliable supply to ChaiWan and Siu Sai Wan. Ozzo was commissioned by the Water Supplies Department (WSD) of the Government of the Hong Kong Special Administrative (HKSAR) to carry…

Agreement No. NTE/01/2016 Engineering Feasibility Study for the Establishment of an Agricultural Park

Project Description: Ozzo undertook a Traffic Impact Assessment (TIA) study in support of the Agricultural Park Feasibility Study. The study focused on assessing existing conditions, estimating the future traffic volume generated by the proposed development, general traffic forecasting, determining overall traffic impact brought about by the proposed development, advising on access arrangements and providing a complete…