Contract No. FSD/C07/2015 – Rezoning Application for Reprovisioning of Chai Wan Ambulance Depot

Project Description: In order to redevelop the Chai Wan Ambulance Depot, the Fire Services Department has submitted an application to the Town Planning Board (TPB) to request relaxation of building height restriction from the prevailing outline zoning plan, Ozzo was commissioned to conduct a Traffic Impact Assessment with the following objectives: review the existing traffic…

Contract No. DC/2010/03 – Kai Tak Nullah Improvement Works

Project Description: Ozzo is delighted to provide independent traffic consultancy services for Kai Tak Nullah Construction across Prince Edward Road East. The scope of work for this project include design of extensive Temporary Traffic Management Schemes (TTMS) and associated Traffic Impact Assessment (TIA) study. The scope of works include traffic data collection to facilitate traffic…

Replacement of the Traffic Control and Surveillance System in the Shing Mun Tunnels

Project Description: To assist with the replacement of the traffic control and surveillance system in the Shing Mun Tunnels, Ozzo provided extensive traffic consulting services which include design of all required temporary traffic management schemes and liaison closely with relevant authorities including the Transport Department, Hong Kong Police Force and Highways Department. Projects: Contract No. 1005EM11 –…

Bus Rapid Transit (BRT) Network Study in Macao

Project Description: Ozzo provided traffic consulting services for a comprehensive conceptual planning of the rapid bus network in Macau and proposed effective short term bus network to be implemented before the commissioning of the new light rail system. The key elements for the study include bus travel demand study, bus route planning, selection bus stop locations,…

Contract No. HY/2013/11 – Provision of Barrier-free Access Facilities for Highways Structures

Project Description: Ozzo was working on a provision of barrier free access facilities for highways structures in order to allow easier and safer ways for pedestrians to cross busy roads without disrupting traffic. Projects: Contract No. HY/2013/11 – Provision of Barrier-free Access Facilities for Highways Structures – Phase 3 Contract 2 Project Type: Temporary Traffic Management Schemes &…

Construction of Pedestrian Facility at Lok Yip Street, Fanling

Project Description: Ozzo was commissioned to design a pedestrian crossing facility at Lok Yip Street in Fanling. The scope of work included an overall layout design for the facility, road marking, traffic sign design, pavement design, a temporary traffic management plan, XPMS management and utilities design where necessary. Projects: Construction of Pedestrian Facility at Lok Yip Street,…

Barra LRT Station in Macau

Project Description: Ozzo was asked to execute the temporary traffic management schemes (TTMS) and temporary road works (TRW) design required for the Barra Light Rail Station in Macau. The scope of work for this project included reviewing TTMS/TRW, undertaking traffic surveys as well as data collection as required. Projects: Contract No. C340B Barra LRT Station in Macau…