Aug72024 Protected: The Sai Sha Road Widening Works for the Comprehensive Development at Shap sz Heung, Sai Kung North, Hong Kong Temporary Traffic Management, Traffic Impact Assessment, Traffic Survey & Interview
Aug22024 Proposed Automatic Parking System at Junction of Hoi Wang Road / Lai Cheung Road Engineering design and Study, Temporary Traffic Management, Traffic Impact Assessment
Jul312024 Feasibility Study for Sassoon Road Campus Expansion for the University of Hong Kong Engineering design and Study, Traffic Impact Assessment
Apr192024 Section 16 Application for the Proposed Temporary Public Vehicle Park in Kam Tin Traffic Impact Assessment
Mar252024 CUHK Technical Feasibility Study of Innovation & Sustainability Hub Traffic Impact Assessment
Aug152023 Traffic Impact Assessment Study for VTC Aircraft and Marine Engineering Centre at Tsing Yi Campus Traffic Impact Assessment
Jul152023 Architectural Consultancy Services Dedicated Rehousing Estate at Hung Shui Kiu Phase 1A Traffic Specialist, Traffic Specialist
Jul12023 Provision of Consultancy Services to Conduct a Feasibility Study on Setting Up Sai Kung Country Parks Visitor Hub at Pat Tam Chung, Sai Kung, Hong Kong Traffic Survey & Interview
Jun152023 Section 16 Planning Application for Temporary Public Vehicle Park in Kwan Tei, Fanling Planning Application
May152023 Contract No. 015/20/PMB203 Traffic Impact Assessment for Modular Integrated Construction (MIC) for Redevelopment of Western Police Married Traffic Impact Assessment
May12023 Proposed Residential Redevelopment at Nos. 134-142A, Yee Kuk Street, Sham Shui Po Engineering design and Study, Temporary Traffic Management, Temporary Traffic Management Implementation
Apr142023 Rezoning Application for Proposed Hospital Redevelopment at No. 222 Argyle Street, Kowloon Traffic Impact Assessment
Mar172023 Development of an Animal Welfare Centre Government Land on Cheung Fai Road, Tsing Yi Engineering design and Study
Mar12023 Temporary Traffic Management Scheme for Façade Shoring Works at Block 4 in Central Police Station Temporary Traffic Management, Temporary Traffic Management Schemes
Jan122023 Provision of Consultancy service for Robotic System Testing in Tseung Kwan O Industrial Estate Temporary Traffic Arrangement, Temporary Traffic Management, Temporary Traffic Management Schemes
Jan122023 Contract No. C340B – Main Works for Barra Station, Macau LRT Temporary Traffic Management, Temporary Traffic Management Schemes
Jan122023 Contract No. HY/2009/08, Widening of Tolo Highway/ Fanling Highway between Island House Interchange and Fanling Temporary Traffic Arrangement, Temporary Traffic Management
Nov112021 Section 16 Planning Application for Proposed Temporary Shop and Services (Convenience Store and Showroom) and Storage Use at Au Tau, Yuen Long Independent Traffic Consultant
May262020 Traffic Impact Assessment for the Project of 053WS – “Uprating of Chai Wan Salt Water Supply System” Traffic Impact Assessment
May182020 Agreement No. NTE/01/2016 Engineering Feasibility Study for the Establishment of an Agricultural Park Traffic Impact Assessment
May142020 Rezoning Application Proposed Custom & Excise Staff Quarter at Area 123 in Tseung Kwan O Traffic Impact Assessment
Dec62019 Contract No. FSD/C07/2015 – Rezoning Application for Reprovisioning of Chai Wan Ambulance Depot Traffic Impact Assessment
Nov292019 Contract No. DC/2010/03 – Kai Tak Nullah Improvement Works Temporary Traffic Arrangement, Temporary Traffic Management, Temporary Traffic Management Implementation, Temporary Traffic Management Schemes , Traffic Impact Assessment
Nov82019 Replacement of the Traffic Control and Surveillance System in the Shing Mun Tunnels Temporary Traffic Management Schemes
Oct252019 Contract No. HY/2013/11 – Provision of Barrier-free Access Facilities for Highways Structures Temporary Traffic Arrangement, Temporary Traffic Management Schemes
Oct182019 Construction of Pedestrian Facility at Lok Yip Street, Fanling Engineering design and Study
Sep62019 Construction Works for Barra Section of Macau LRT Temporary Traffic Management Implementation, Traffic Impact Assessment
Aug232019 Macau Galaxy Proposed Right Turn Opening at Estrada da Bala de Nossa Senhora Da Esperanca Engineering design and Study
Aug22019 Shatin to Central Link Independent Traffic Consultant, Temporary Traffic Arrangement, Temporary Traffic Management, Traffic Impact Assessment
Jul262019 Tuen Mun – Chek Lap Kok Link Temporary Traffic Arrangement, Temporary Traffic Management, Traffic Impact Assessment
Jul192019 Redevelopment of Kwai Chung Hospital (Phase 2 & 3) Engineering design and Study, Traffic Impact Assessment
Jul122019 Widening of Tolo Highway/ Fanling Highway Independent Traffic Consultant, Temporary Traffic Arrangement
Jun282019 Reconstruction and Improvement of Tuen Mun Road Temporary Traffic Management, Traffic Study
Jun142019 Design of Pedestrian Walkway System and Signs Cross River Pedestrian Bridge Engineering design and Study
Jun32019 Contract No. HY/2007/09 – Reconstruction and Improvement of Tuen Mun Road – Eastern Section – Independent Checking Engineer Transport Modelling
Jun32019 Contract No. HY/2007/06 & HY/2009/08 Tolo Highway/ Fanling Highway and Tuen Mun Road Project Temporary Traffic Management Implementation
Jun32019 Traffic Study on C&D Materials Handling Facilities in Tseung Kwan O Area 137 and Tuen Mun Area 38 Traffic Study