Temporary Traffic Management Scheme for Façade Shoring Works at Block 4 in Central Police Station

Project Description: Block 4 is one of 16 historic buildings of Central Police Station (CPS). The recovery work for Block 4 comprises demolition works, steel façade shoring works and the main contract works. As Block 4 is located next to Arbuthnot Road, traffic on Arbuthnot Road will have to be properly managed during the process…

Provision of Consultancy service for Robotic System Testing in Tseung Kwan O Industrial Estate

Project Description: Ozzo was commissioned to provide TTM Scheme and Traffic Impact Assessment Report for Robot System for the Placement and Collection of Traffic Cones and Lanterns in Road Works in Tseung Kwan O Industrial Estate. Projects: Provision of Consultancy service on design of TTM Scheme and Traffic Impact Assessment Report for Robotic System Testing…

Contract No. C340B – Main Works for Barra Station, Macau LRT

Project Description: Ozzo was asked to execute the temporary traffic management schemes (TTMS) and temporary road works (TRW) design required for the Barra Light Rail Station in Macau. It is now expected that the station will be completed and opened in 2023 Projects: Contract No. C340B – Main Works for Barra Station, Macau LRT Project…

Contract No. HY/2009/08, Widening of Tolo Highway/ Fanling Highway between Island House Interchange and Fanling

Project Description: To meet the increasing traffic needs of the Tolo and Fanling Highways, Ozzo was asked to assess prior traffic conditions, provide temporary traffic arrangements to facilitate, the widening construction on both Tolo and Fanling Highways. Projects: Contract No. HY/2009/08, Widening of Tolo Highway/ Fanling Highway between Island House Interchange and Fanling Project Type:  Temporary…

Section 16 Planning Application for Proposed Temporary Shop and Services (Convenience Store and Showroom) and Storage Use at Au Tau, Yuen Long

Project Description: Ozzo and Toco have successfully seeks the permission of the Town Planning Board in within 2 months to allow the provision of a retail shop and convenience store, showroom for the Intelligent Traffic System (ITS) facilities, storage of temporary traffic management implementation services at Au Tau, Yuen Long. Projects: Section 16 Planning Application for…

Traffic Impact Assessment for the Project of 053WS – “Uprating of Chai Wan Salt Water Supply System”

Project Description: Chai Wan salt water supply system has nearly reached the designed capacity limit, so the system must be upgraded in order to provide adequate and reliable supply to ChaiWan and Siu Sai Wan. Ozzo was commissioned by the Water Supplies Department (WSD) of the Government of the Hong Kong Special Administrative (HKSAR) to carry…

Agreement No. NTE/01/2016 Engineering Feasibility Study for the Establishment of an Agricultural Park

Project Description: Ozzo undertook a Traffic Impact Assessment (TIA) study in support of the Agricultural Park Feasibility Study. The study focused on assessing existing conditions, estimating the future traffic volume generated by the proposed development, general traffic forecasting, determining overall traffic impact brought about by the proposed development, advising on access arrangements and providing a complete…

Rezoning Application Proposed Custom & Excise Staff Quarter at Area 123 in Tseung Kwan O

Project Description: Ozzo was commissioned to undertake a Traffic Impact Assessment (TIA) Study to support a planning application to construct the Departmental Quarters (DQ) for the Customs & Excise Department (C&ED) at Tseung Kwan O. The study assessed the traffic impact to be induced by the proposed development by reviewing existing traffic conditions, estimating potential…

Contract No. FSD/C07/2015 – Rezoning Application for Reprovisioning of Chai Wan Ambulance Depot

Project Description: In order to redevelop the Chai Wan Ambulance Depot, the Fire Services Department has submitted an application to the Town Planning Board (TPB) to request relaxation of building height restriction from the prevailing outline zoning plan, Ozzo was commissioned to conduct a Traffic Impact Assessment with the following objectives: review the existing traffic…

Contract No. DC/2010/03 – Kai Tak Nullah Improvement Works

Project Description: Ozzo is delighted to provide independent traffic consultancy services for Kai Tak Nullah Construction across Prince Edward Road East. The scope of work for this project include design of extensive Temporary Traffic Management Schemes (TTMS) and associated Traffic Impact Assessment (TIA) study. The scope of works include traffic data collection to facilitate traffic…