Skip to content
OZZO Technology
OZZO TechnologyOZZO Technology
  • Home
  • About us
  • Services
  • System
    • SAPRO
    • ATC Map
    • TTM Map
    • Pharmaceutical Company System
    • IT Maintenance with storage
    • Cash Balance System
  • Projects
  • Brochure
  • Careers
  • Contact us
  • EnglishEnglish
    • 中文 (香港)中文 (香港)
  • Home
  • About us
  • Services
  • System
    • SAPRO
    • ATC Map
    • TTM Map
    • Pharmaceutical Company System
    • IT Maintenance with storage
    • Cash Balance System
  • Projects
  • Brochure
  • Careers
  • Contact us
  • EnglishEnglish
    • 中文 (香港)中文 (香港)

Yearly Archives: 2019

You are here:
  1. Home
  2. 2019
  3. (Page 4)

HKBU – Baptist University Road Campus Phase II Dev

Traffic Impact AssessmentBy TrafficKidJune 3, 2019Leave a comment

Project Description: OZZO undertook a traffic impact assessment for the campus’ development. Project Type: Traffic Impact Assessment Project year: 2007 Direct Client: BMT Asia Pacific Ultimate Client: Hong Kong Baptist University

Traffic Study on C&D Materials Handling Facilities in Tseung Kwan O Area 137 and Tuen Mun Area 38

Traffic StudyBy TrafficKidJune 3, 2019Leave a comment

Project Description: OZZO carried out surveys and predicted future traffic by calibrating and validating the Transport Department’s Base District Traffic Model (BDTM). Project Type: Traffic Study Project year: 2008 Direct Client: Mannings (Asia) Consultants Ltd Ultimate Client: Civil Engineering Development Department

Additional Vehicular Access in Airport

Engineering design and StudyBy TrafficKidMay 31, 2019Leave a comment

Project Description: OZZO carried out a feasibility study and a detailed design of roads and drains for the additional vehicular access at South Perimeter Road of the Airport. Project Type: Engineering design and Study Project year: 2007 Direct Client: Civil Asset Management Ultimate Client: HAECO

1234
©版权所有:深圳奥世傲科技有限公司
粤ICP备16127686号
©All Right Reserved by Ozzo Technology
Go to Top
Skip Video