十二月122024 受保護的文章:Contract No. NE/2017/06 Tseung Kwan O – Lam Tin Tunnel – Traffic Control and Surveillance System (TCSS) and Associated Works Temporary Traffic Management
十二月122024 受保護的文章:Agreement No. CE 23/2009 (CE) Improvement Works for Mui Wo Facelift Design and Construction Engineering design and Study
十月72024 Provision of Service for Traffic Impact Assessment at Lok Ma Chau Control Point Traffic Impact Assessment, Transport Modelling
八月192024 受保護的文章:The Sai Sha Road Widening Works for the Comprehensive Development at Shap sz Heung, Sai Kung North, Hong Kong Temporary Traffic Management, Traffic Impact Assessment, Traffic Survey & Interview
八月22024 Proposed Automatic Parking System at Junction of Hoi Wang Road / Lai Cheung Road Engineering design and Study, Temporary Traffic Management, Traffic Impact Assessment
七月312024 Feasibility Study for Sassoon Road Campus Expansion for the University of Hong Kong Engineering design and Study, Traffic Impact Assessment
四月192024 Section 16 Application for the Proposed Temporary Public Vehicle Park in Kam Tin Traffic Impact Assessment
三月252024 CUHK Technical Feasibility Study of Innovation & Sustainability Hub Traffic Impact Assessment
八月152023 Traffic Impact Assessment Study for VTC Aircraft and Marine Engineering Centre at Tsing Yi Campus Traffic Impact Assessment
七月152023 Architectural Consultancy Services Dedicated Rehousing Estate at Hung Shui Kiu Phase 1A Traffic Specialist
七月12023 Provision of Consultancy Services to Conduct a Feasibility Study on Setting Up Sai Kung Country Parks Visitor Hub at Pat Tam Chung, Sai Kung, Hong Kong Traffic Survey & Interview
六月152023 Section 16 Planning Application for Temporary Public Vehicle Park in Kwan Tei, Fanling Planning Application
五月152023 Contract No. 015/20/PMB203 Traffic Impact Assessment for Modular Integrated Construction (MIC) for Redevelopment of Western Police Married Traffic Impact Assessment
五月12023 Proposed Residential Redevelopment at Nos. 134-142A, Yee Kuk Street, Sham Shui Po Engineering design and Study, Temporary Traffic Management, Temporary Traffic Management Schemes
四月142023 Rezoning Application for Proposed Hospital Redevelopment at No. 222 Argyle Street, Kowloon Traffic Impact Assessment
四月142023 Development of an Animal Welfare Centre Government Land on Cheung Fai Road, Tsing Yi Engineering design and Study
三月292023 Temporary Traffic Management Scheme for Façade Shoring Works at Block 4 in Central Police Station Temporary Traffic Management, Temporary Traffic Management Schemes
三月292023 Contract No. C340B – Main Works for Barra Station, Macau LRT Temporary Traffic Management, Temporary Traffic Management Schemes
三月292023 Section 16 Planning Application for Proposed Temporary Shop and Services (Convenience Store and Showroom) and Storage Use at Au Tau, Yuen Long Independent Traffic Consultant
一月122023 Contract No. HY/2009/08, Widening of Tolo Highway/ Fanling Highway between Island House Interchange and Fanling Temporary Traffic Arrangement, Temporary Traffic Management
一月122023 Provision of Consultancy service on design of TTM Scheme and Traffic Impact Assessment Report for Robotic System Testing in Tseung Kwan O Industrial Estate Temporary Traffic Arrangement, Temporary Traffic Management, Temporary Traffic Management Schemes
四月212021 Traffic Impact Assessment for the Project of 053WS – “Uprating of Chai Wan Salt Water Supply System” Traffic Impact Assessment
四月212021 Agreement No. NTE/01/2016 Engineering Feasibility Study for the Establishment of an Agricultural Park Traffic Impact Assessment
四月212021 Rezoning Application Proposed Custom & Excise Staff Quarter at Area 123 in Tseung Kwan O Traffic Impact Assessment
四月212021 Contract No. FSD/C07/2015 – Rezoning Application for Reprovisioning of Chai Wan Ambulance Depot Traffic Impact Assessment
四月212021 Contract No. DC/2010/03 – Kai Tak Nullah Improvement Works Temporary Traffic Arrangement, Temporary Traffic Management, Temporary Traffic Management Implementation, Temporary Traffic Management Schemes , Traffic Impact Assessment
四月212021 Replacement of the Traffic Control and Surveillance System in the Shing Mun Tunnels Temporary Traffic Management Schemes
四月212021 Contract No. HY/2013/11 – Provision of Barrier-free Access Facilities for Highways Structures Temporary Traffic Arrangement, Temporary Traffic Management Schemes
四月212021 Construction Works for Barra Section of Macau LRT Temporary Traffic Management Implementation, Traffic Impact Assessment
四月212021 Macau Galaxy Proposed Right Turn Opening at Estrada da Bala de Nossa Senhora Da Esperanca Engineering design and Study
四月212021 Shatin to Central Link Independent Traffic Consultant, Temporary Traffic Arrangement, Temporary Traffic Management, Traffic Impact Assessment
四月212021 Tuen Mun – Chek Lap Kok Link Temporary Traffic Arrangement, Temporary Traffic Management, Traffic Impact Assessment
四月212021 Redevelopment of Kwai Chung Hospital (Phase 2 & 3) Engineering design and Study, Traffic Impact Assessment
四月212021 Widening of Tolo Highway/ Fanling Highway Independent Traffic Consultant, Temporary Traffic Arrangement
四月212021 Design of Pedestrian Walkway System and Signs Cross River Pedestrian Bridge Engineering design and Study
四月212021 Contract No. HY/2007/09 – Reconstruction and Improvement of Tuen Mun Road – Eastern Section – Independent Checking Engineer Transport Modelling
四月212021 Contract No. HY/2007/06 & HY/2009/08 Tolo Highway/ Fanling Highway and Tuen Mun Road Project Temporary Traffic Management Implementation
四月212021 Traffic Study on C&D Materials Handling Facilities in Tseung Kwan O Area 137 and Tuen Mun Area 38 Traffic Study