Skip to content
OZZO Technology
OZZO TechnologyOZZO Technology
  • 首頁
  • 關於我們
  • 服務
  • 系統簡介
    • SAPRO
    • ATC Map
    • TTM Map
    • 製藥公司系統
    • 信息技術維護及儲存
    • 現金餘額系統
  • 項目簡介
  • 企業簡訊
  • 加入我們
  • 聯絡我們
  • 中文 (香港)中文 (香港)
    • EnglishEnglish
  • 首頁
  • 關於我們
  • 服務
  • 系統簡介
    • SAPRO
    • ATC Map
    • TTM Map
    • 製藥公司系統
    • 信息技術維護及儲存
    • 現金餘額系統
  • 項目簡介
  • 企業簡訊
  • 加入我們
  • 聯絡我們
  • 中文 (香港)中文 (香港)
    • EnglishEnglish

Yearly Archives: 2021

You are here:
  1. Home
  2. 2021

Traffic Impact Assessment for the Project of 053WS – “Uprating of Chai Wan Salt Water Supply System”

Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Chai Wan salt water supply system …

Agreement No. NTE/01/2016 Engineering Feasibility Study for the Establishment of an Agricultural Park

Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Ozzo undertook a Traffic Impact As…

Rezoning Application Proposed Custom & Excise Staff Quarter at Area 123 in Tseung Kwan O

Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Ozzo was commissioned to undertake…

Contract No. FSD/C07/2015 – Rezoning Application for Reprovisioning of Chai Wan Ambulance Depot

Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: In order to redevelop the Chai Wan…

Contract No. DC/2010/03 – Kai Tak Nullah Improvement Works

Temporary Traffic Arrangement, Temporary Traffic Management, Temporary Traffic Management Implementation, Temporary Traffic Management Schemes , Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Ozzo is delighted to provide indep…

Proposed A&A Works for Installation of LED Screens at Windsor House

Transport ModellingBy TrafficKid四月 21, 2021

Project Description: Due to the large amount of pedestr…

Replacement of the Traffic Control and Surveillance System in the Shing Mun Tunnels

Temporary Traffic Management Schemes By TrafficKid四月 21, 2021

Project Description: To assist with the replacement of …

Bus Rapid Transit (BRT) Network Study in Macao

Traffic StudyBy TrafficKid四月 21, 2021

Project Description: Ozzo provided traffic consulting s…

Contract No. HY/2013/11 – Provision of Barrier-free Access Facilities for Highways Structures

Temporary Traffic Arrangement, Temporary Traffic Management Schemes By TrafficKid四月 21, 2021

Project Description: Ozzo was working on a provision of…

Construction of Pedestrian Facility at Lok Yip Street, Fanling

Engineering design and StudyBy TrafficKid四月 21, 2021

Project Description: Ozzo was commissioned to design a …

1234
©版权所有:深圳奥世傲科技有限公司
粤ICP备16127686号
©All Right Reserved by Ozzo Technology
Go to Top
Skip Video