<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>HyD &#8211; OZZO Technology</title>
	<atom:link href="http://www.ozzotec.com/zh/tag/hyd-zh/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.ozzotec.com</link>
	<description></description>
	<lastBuildDate>Wed, 21 Apr 2021 08:40:49 +0000</lastBuildDate>
	<language>zh-HK</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=5.2</generator>
	<item>
		<title>Replacement of the Traffic Control and Surveillance System in the Shing Mun Tunnels</title>
		<link>http://www.ozzotec.com/zh/replacement-of-the-traffic-control-and-surveillance-system-in-the-shing-mun-tunnels-2/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=replacement-of-the-traffic-control-and-surveillance-system-in-the-shing-mun-tunnels-2</link>
				<pubDate>Wed, 21 Apr 2021 08:12:47 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Management Schemes ]]></category>
		<category><![CDATA[EMSD]]></category>
		<category><![CDATA[HyD]]></category>
		<category><![CDATA[ShingMunTunnel]]></category>
		<category><![CDATA[SurveillanceSystem]]></category>
		<category><![CDATA[TD]]></category>
		<category><![CDATA[TMLG]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[TrafficControl]]></category>
		<category><![CDATA[TTMS]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=717</guid>
				<description><![CDATA[Project Description: To assist with the replacement of &#8230;]]></description>
								<content:encoded><![CDATA[<p><span style="color: #003366;"><strong>Project Description: </strong>To assist with the replacement of the traffic control and surveillance system in the Shing Mun Tunnels, Ozzo provided extensive traffic consulting services which include design of all required temporary traffic management schemes and liaison closely with relevant authorities including the Transport Department, Hong Kong Police Force and Highways Department.</span></p>
<p><span style="color: #003366;"><strong>Projects: </strong>Contract No. 1005EM11 – Replacement of the Traffic Control and Surveillance System in the Shing Mun Tunnels</span></p>
<div class="text_exposed_show">
<p><span style="color: #003366;"><strong>Project Type: </strong>Temporary Traffic Management Schemes </span></p>
<p><span style="color: #003366;"><strong>Project Year: </strong><span class="text_exposed_show">2012-2016</span></span></p>
<p><span style="color: #003366;"><strong>Direct Client: </strong>Unison Construction Engineering Ltd</span></p>
<p><span style="color: #003366;"><strong>Ultimate Client: </strong>Electrical and Mechanical Services Department</span></p>
<p><img class="alignnone size-full wp-image-546" src="http://www.ozzotec.com/wp-content/uploads/2019/11/VIDEO040720190718-163755.jpg" alt="" width="833" height="481" srcset="http://www.ozzotec.com/wp-content/uploads/2019/11/VIDEO040720190718-163755.jpg 833w, http://www.ozzotec.com/wp-content/uploads/2019/11/VIDEO040720190718-163755-300x173.jpg 300w, http://www.ozzotec.com/wp-content/uploads/2019/11/VIDEO040720190718-163755-768x443.jpg 768w" sizes="(max-width: 833px) 100vw, 833px" /></p>
</div>
]]></content:encoded>
										</item>
		<item>
		<title>Contract No. HY/2013/11 &#8211; Provision of Barrier-free Access Facilities for Highways Structures</title>
		<link>http://www.ozzotec.com/zh/contract-no-hy-2013-11-provision-of-barrier-free-access-facilities-for-highways-structures-2/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=contract-no-hy-2013-11-provision-of-barrier-free-access-facilities-for-highways-structures-2</link>
				<pubDate>Wed, 21 Apr 2021 08:12:04 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Arrangement]]></category>
		<category><![CDATA[Temporary Traffic Management Schemes ]]></category>
		<category><![CDATA[HighwayStructures]]></category>
		<category><![CDATA[HY201311]]></category>
		<category><![CDATA[HyD]]></category>
		<category><![CDATA[Traffic]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=719</guid>
				<description><![CDATA[Project Description: Ozzo was working on a provision of&#8230;]]></description>
								<content:encoded><![CDATA[<p><span style="color: #003366;"><strong>Project Description: </strong>Ozzo was working on a provision of barrier free access facilities for highways structures in order to allow easier and safer ways for pedestrians to cross busy roads without disrupting traffic.</span></p>
<p><span style="color: #003366;"><strong>Projects: </strong>Contract No. HY/2013/11 &#8211; Provision of Barrier-free Access Facilities for Highways Structures &#8211; Phase 3 Contract 2 </span></p>
<div class="text_exposed_show">
<p><span style="color: #003366;"><strong>Project Type: </strong>Temporary Traffic Management Schemes &amp; Temporary Traffic Arrangement</span></p>
<p><span style="color: #003366;"><strong>Project Year:</strong> 2014-2017</span></p>
<p><span style="color: #003366;"><strong>Direct Client:</strong> China Harbour Engineering Company Ltd.</span></p>
<p><span style="color: #003366;"><strong>Ultimate Client:</strong> Highways Department</span></p>
<p><img class="alignnone size-full wp-image-539" src="http://www.ozzotec.com/wp-content/uploads/2019/10/80547-NS28A-ped-201409191.jpg" alt="" width="1191" height="1685" srcset="http://www.ozzotec.com/wp-content/uploads/2019/10/80547-NS28A-ped-201409191.jpg 1191w, http://www.ozzotec.com/wp-content/uploads/2019/10/80547-NS28A-ped-201409191-212x300.jpg 212w, http://www.ozzotec.com/wp-content/uploads/2019/10/80547-NS28A-ped-201409191-768x1087.jpg 768w, http://www.ozzotec.com/wp-content/uploads/2019/10/80547-NS28A-ped-201409191-724x1024.jpg 724w" sizes="(max-width: 1191px) 100vw, 1191px" /></p>
</div>
]]></content:encoded>
										</item>
		<item>
		<title>Tuen Mun – Chek Lap Kok Link</title>
		<link>http://www.ozzotec.com/zh/tuen-mun-chek-lap-kok-link-2/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=tuen-mun-chek-lap-kok-link-2</link>
				<pubDate>Wed, 21 Apr 2021 08:04:52 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Arrangement]]></category>
		<category><![CDATA[Temporary Traffic Management]]></category>
		<category><![CDATA[Traffic Impact Assessment]]></category>
		<category><![CDATA[Bridge]]></category>
		<category><![CDATA[HKSAR]]></category>
		<category><![CDATA[HongKongZhuhaiMacaoBridge]]></category>
		<category><![CDATA[HyD]]></category>
		<category><![CDATA[HZMB]]></category>
		<category><![CDATA[TIA]]></category>
		<category><![CDATA[TMCLKL]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[TTM]]></category>
		<category><![CDATA[Tunnel]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=732</guid>
				<description><![CDATA[Project Description: The Highways Department (HyD) of t&#8230;]]></description>
								<content:encoded><![CDATA[<p><span style="color: #003366;"><strong>Project Description: </strong>The Highways Department (HyD) of the Government of the Hong Kong Special Administrative Region (HKSAR) commissioned the construction of sub-sea tunnels to connect Tuen Mun and Chek Lap Kok (TM-CLKL). The TM-CLKL link will provide the most direct route between the Northwest New Territories and the Hong Kong – Zhuhai – Macao Bridge (HZMB). Ozzo was brought on to take over the traffic impact assessment and temporary traffic management for this project in order to identify, asses<span class="text_exposed_show">s and mitigate potential traffic impacts that might arise from construction trucks involved with the construction process.</span></span></p>
<p><span style="color: #003366;"><strong>Projects: </strong></span></p>
<p><span style="color: #003366;">Contract No. HY/2012/07, Tuen Mun – Chek Lap Kok Link Southern Connection Viaduct Link</span><br />
<span style="color: #003366;">Contract No. HY/2013/12 Tuen Mun – Chek Lap Kok Link Northern Connection Toll Plaza and Associated Works</span><br />
<span style="color: #003366;">Contract No. HY/2012/08 &#8211; Tuen Mun &#8211; Chek Lap Kok Link Northern Connection Sub-sea Tunnel Section</span></p>
<div class="text_exposed_show">
<p><span style="color: #003366;"><strong>Project Type: </strong>Traffic Impact Arrangement, Temporary Traffic Management &amp; Traffic Impact Assessment</span></p>
<p><span style="color: #003366;"><strong>Project Year:</strong> 2012-2019</span></p>
<p><span style="color: #003366;"><strong>Direct Client:</strong> Gammon Construction Limited / Leighton Contractors (Asia) Limited / CRBC – KADEN Joint Venture / Dragages – Bouygues Joint Venture</span></p>
<p><span style="color: #003366;"><strong>Ultimate Client:</strong> Highways Department</span></p>
<p><img class="alignnone size-full wp-image-426" src="http://www.ozzotec.com/wp-content/uploads/2019/07/DSC_7146_WEB.jpg" alt="" width="2048" height="1325" srcset="http://www.ozzotec.com/wp-content/uploads/2019/07/DSC_7146_WEB.jpg 2048w, http://www.ozzotec.com/wp-content/uploads/2019/07/DSC_7146_WEB-300x194.jpg 300w, http://www.ozzotec.com/wp-content/uploads/2019/07/DSC_7146_WEB-768x497.jpg 768w, http://www.ozzotec.com/wp-content/uploads/2019/07/DSC_7146_WEB-1024x663.jpg 1024w" sizes="(max-width: 2048px) 100vw, 2048px" /></p>
</div>
]]></content:encoded>
										</item>
		<item>
		<title>Widening of Tolo Highway/ Fanling Highway</title>
		<link>http://www.ozzotec.com/zh/widening-of-tolo-highway-fanling-highway-2/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=widening-of-tolo-highway-fanling-highway-2</link>
				<comments>http://www.ozzotec.com/zh/widening-of-tolo-highway-fanling-highway-2/#respond</comments>
				<pubDate>Wed, 21 Apr 2021 08:04:01 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Independent Traffic Consultant]]></category>
		<category><![CDATA[Temporary Traffic Arrangement]]></category>
		<category><![CDATA[Fanling]]></category>
		<category><![CDATA[Fanling Highway]]></category>
		<category><![CDATA[Gammon]]></category>
		<category><![CDATA[HighwaysDepartmen]]></category>
		<category><![CDATA[HyD]]></category>
		<category><![CDATA[Tolo Highway]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[TTA]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=734</guid>
				<description><![CDATA[Project Description: To meet the increasing traffic nee&#8230;]]></description>
								<content:encoded><![CDATA[<p><span style="color: #003366;"><strong>Project Description: </strong>To meet the increasing traffic needs of the Tolo and Fanling Highways, Ozzo was asked to assess prior traffic conditions, provide temporary traffic arrangements to facilitate, the widening construction on both Tolo and Fanling Highways.</span></p>
<p><strong><span style="color: #003366;">Projects:</span></strong><br />
<span style="color: #003366;">Contract No. HY/2009/08, Widening of Tolo Highway/ Fanling Highway between Island House Interchange and Fanling</span><br />
<span style="color: #003366;">Contract No. HY/2007/06, Upgrading / Improvement of Roadside Man-made Slopes / Retaining Walls in Urban Region (Package II)</span></p>
<div class="text_exposed_show">
<p><span style="color: #003366;"><strong>Project Type: </strong>Independent Traffic Consultant &amp; Temporary Traffic Arrangement<br />
</span></p>
<p><span style="color: #003366;"><strong>Project Year:</strong> 2009-2014</span></p>
<p><span style="color: #003366;"><strong>Direct Client:</strong> Gammon Construction Limited</span></p>
<p><span style="color: #003366;"><strong>Ultimate Client:</strong> Highways Department</span></p>
</div>
<p><img class="alignnone size-full wp-image-414" src="http://www.ozzotec.com/wp-content/uploads/2019/07/GCL_048-1.jpg" alt="" width="637" height="960" srcset="http://www.ozzotec.com/wp-content/uploads/2019/07/GCL_048-1.jpg 637w, http://www.ozzotec.com/wp-content/uploads/2019/07/GCL_048-1-199x300.jpg 199w" sizes="(max-width: 637px) 100vw, 637px" /></p>
]]></content:encoded>
							<wfw:commentRss>http://www.ozzotec.com/zh/widening-of-tolo-highway-fanling-highway-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
		<item>
		<title>Reconstruction and Improvement of Tuen Mun Road</title>
		<link>http://www.ozzotec.com/zh/reconstruction-and-improvement-of-tuen-mun-road-2/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=reconstruction-and-improvement-of-tuen-mun-road-2</link>
				<comments>http://www.ozzotec.com/zh/reconstruction-and-improvement-of-tuen-mun-road-2/#respond</comments>
				<pubDate>Wed, 21 Apr 2021 08:03:14 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Management]]></category>
		<category><![CDATA[Traffic Study]]></category>
		<category><![CDATA[Gammon]]></category>
		<category><![CDATA[HyD]]></category>
		<category><![CDATA[SurveillanceSystem]]></category>
		<category><![CDATA[TrafficControl]]></category>
		<category><![CDATA[TrafficReview]]></category>
		<category><![CDATA[TuenMunRoad]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=736</guid>
				<description><![CDATA[Project Description: Ozzo provided traffic consulting s&#8230;]]></description>
								<content:encoded><![CDATA[<p><span style="color: #003366;"><strong>Project Description: </strong>Ozzo provided traffic consulting services on improvement measures aimed to improve the traffic efficiency of Tuen Mun Road by creating advanced simulations for plan designs, installing temporary traffic arrangements and carrying out careful reconstruction.</span></p>
<p><span style="color: #003366;"><strong>Projects: </strong></span></p>
<p><span style="color: #003366;">Contract No.: HY/2007/09, Reconstruction and Improvement of Tuen Mun Road &#8211; Eastern Section </span></p>
<p><span style="color: #003366;">Contract No.: HY/2007/09, HY/2007/10, HY/2008/11, Tuen Mun Road Speed Reduction Review Study</span></p>
<p><span style="color: #003366;">Contract No.: HY/2008/13, Reconstruction and Improvement of Tuen Mun Road Traffic Control and Surveillance System</span></p>
<p><span style="color: #003366;"><strong>Project Type: </strong>Traffic Study &amp; Temporary Traffic Management </span></p>
<p><span style="color: #003366;"><strong>Project year:</strong> 2008-2014</span></p>
<p><span style="color: #003366;"><strong>Direct Client: </strong>Gammon Construction Limited</span></p>
<p><span style="color: #003366;"><strong>Ultimate Client: </strong>Highways Department</span></p>
<div id="u_6_11" class="_43f9 _63qh" data-ft="{&quot;tn&quot;:&quot;,K&quot;}">
<div id="id_5d15ba0c261e85e49674291" class="text_exposed_root text_exposed">
<div class="text_exposed_show"></div>
</div>
</div>
<p><img class="alignnone size-full wp-image-402" src="http://www.ozzotec.com/wp-content/uploads/2019/06/Merge03_SIZE.jpg" alt="" width="2048" height="448" srcset="http://www.ozzotec.com/wp-content/uploads/2019/06/Merge03_SIZE.jpg 2048w, http://www.ozzotec.com/wp-content/uploads/2019/06/Merge03_SIZE-300x66.jpg 300w, http://www.ozzotec.com/wp-content/uploads/2019/06/Merge03_SIZE-768x168.jpg 768w, http://www.ozzotec.com/wp-content/uploads/2019/06/Merge03_SIZE-1024x224.jpg 1024w" sizes="(max-width: 2048px) 100vw, 2048px" /></p>
]]></content:encoded>
							<wfw:commentRss>http://www.ozzotec.com/zh/reconstruction-and-improvement-of-tuen-mun-road-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
	</channel>
</rss>
