Skip to content
OZZO Technology
OZZO TechnologyOZZO Technology
  • 首頁
  • 關於我們
  • 服務
  • 系統簡介
    • SAPRO
    • ATC Map
    • TTM Map
    • 製藥公司系統
    • 信息技術維護及儲存
    • 現金餘額系統
    • 交通數字孿生系統
    • 智慧停車管理系統
  • 項目簡介
  • 企業簡訊
  • 加入我們
  • 聯絡我們
  • 中文 (香港)中文 (香港)
    • EnglishEnglish
  • 首頁
  • 關於我們
  • 服務
  • 系統簡介
    • SAPRO
    • ATC Map
    • TTM Map
    • 製藥公司系統
    • 信息技術維護及儲存
    • 現金餘額系統
    • 交通數字孿生系統
    • 智慧停車管理系統
  • 項目簡介
  • 企業簡訊
  • 加入我們
  • 聯絡我們
  • 中文 (香港)中文 (香港)
    • EnglishEnglish

Category Archives: Our Projects

You are here:
  1. Home
  2. Category "Our Projects"
  3. (Page 5)

Macau Signalised Junctions Improvement Study

Traffic StudyBy TrafficKid四月 21, 2021

Project Description: Ozzo was commissioned to work on t…

Construction Works for Barra Section of Macau LRT

Temporary Traffic Management Implementation, Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Ozzo was highly involved in the pl…

New Medical Complex in Cotai, Macau

Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Ozzo was commissioned to perform a…

Macau Galaxy Proposed Right Turn Opening at Estrada da Bala de Nossa Senhora Da Esperanca

Engineering design and StudyBy TrafficKid四月 21, 2021

Project Description: Ozzo was asked to create the traff…

Kerry Siam Seaport Chonburi, Thailand

Engineering design and StudyBy TrafficKid四月 21, 2021

Project Description: Ozzo was commissioned to develop a…

Pedestrian Link Study at Hua Guo Yuan, Guiyang, China

Engineering design and StudyBy TrafficKid四月 21, 2021

Project Description: Ozzo undertook a conceptual and pr…

Shatin to Central Link

Independent Traffic Consultant, Temporary Traffic Arrangement, Temporary Traffic Management, Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Ozzo was commissioned to undertake…

Tuen Mun – Chek Lap Kok Link

Temporary Traffic Arrangement, Temporary Traffic Management, Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: The Highways Department (HyD) of t…

Redevelopment of Kwai Chung Hospital (Phase 2 & 3)

Engineering design and Study, Traffic Impact AssessmentBy TrafficKid四月 21, 2021Leave a comment

Project Description: Ozzo was commissioned by the clien…

Widening of Tolo Highway/ Fanling Highway

Independent Traffic Consultant, Temporary Traffic ArrangementBy TrafficKid四月 21, 2021Leave a comment

Project Description: To meet the increasing traffic nee…

1
2
…34567
©版权所有:深圳奥世傲科技有限公司
粤ICP备16127686号
©All Right Reserved by Ozzo Technology
  • WhatsApp
  • Go to Top
    Skip Video