Skip to content
OZZO Technology
OZZO TechnologyOZZO Technology
  • 首頁
  • 關於我們
  • 服務
  • 系統簡介
    • SAPRO
    • ATC Map
    • TTM Map
    • 製藥公司系統
    • 信息技術維護及儲存
    • 現金餘額系統
    • 交通數字孿生系統
    • 智慧停車管理系統
  • 項目簡介
  • 企業簡訊
  • 加入我們
  • 聯絡我們
  • 中文 (香港)中文 (香港)
    • EnglishEnglish
  • 首頁
  • 關於我們
  • 服務
  • 系統簡介
    • SAPRO
    • ATC Map
    • TTM Map
    • 製藥公司系統
    • 信息技術維護及儲存
    • 現金餘額系統
    • 交通數字孿生系統
    • 智慧停車管理系統
  • 項目簡介
  • 企業簡訊
  • 加入我們
  • 聯絡我們
  • 中文 (香港)中文 (香港)
    • EnglishEnglish

Category Archives: Our Projects

You are here:
  1. Home
  2. Category "Our Projects"
  3. (Page 4)

Contract No. DC/2010/03 – Kai Tak Nullah Improvement Works

Temporary Traffic Arrangement, Temporary Traffic Management, Temporary Traffic Management Implementation, Temporary Traffic Management Schemes , Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Ozzo is delighted to provide indep…

Proposed A&A Works for Installation of LED Screens at Windsor House

Transport ModellingBy TrafficKid四月 21, 2021

Project Description: Due to the large amount of pedestr…

Replacement of the Traffic Control and Surveillance System in the Shing Mun Tunnels

Temporary Traffic Management Schemes By TrafficKid四月 21, 2021

Project Description: To assist with the replacement of …

Bus Rapid Transit (BRT) Network Study in Macao

Traffic StudyBy TrafficKid四月 21, 2021

Project Description: Ozzo provided traffic consulting s…

Contract No. HY/2013/11 – Provision of Barrier-free Access Facilities for Highways Structures

Temporary Traffic Arrangement, Temporary Traffic Management Schemes By TrafficKid四月 21, 2021

Project Description: Ozzo was working on a provision of…

Construction of Pedestrian Facility at Lok Yip Street, Fanling

Engineering design and StudyBy TrafficKid四月 21, 2021

Project Description: Ozzo was commissioned to design a …

Traffic Noise Study In Sham Shui Po District

Traffic Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Sham Shui Po District has been fac…

Comprehensive Development Area in Taipa for EIA Study

Environmental Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Ozzo was requested to conduct a de…

Barra LRT Station in Macau

Temporary Traffic Management Schemes By TrafficKid四月 21, 2021

Project Description: Ozzo was asked to execute the temp…

Traffic Survey for MGM Hotel in Cotai, Macau

Environmental Impact AssessmentBy TrafficKid四月 21, 2021

Project Description: Ozzo was requested to conduct an i…

1234567
©版权所有:深圳奥世傲科技有限公司
粤ICP备16127686号
©All Right Reserved by Ozzo Technology
  • WhatsApp
  • Go to Top
    Skip Video