<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>TTMS &#8211; OZZO Technology</title>
	<atom:link href="http://www.ozzotec.com/tag/ttms/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.ozzotec.com</link>
	<description></description>
	<lastBuildDate>Thu, 06 Feb 2025 08:41:12 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=5.2</generator>
	<item>
		<title>Temporary Traffic Management Scheme for Façade Shoring Works at Block 4 in Central Police Station</title>
		<link>http://www.ozzotec.com/temporary-traffic-management-scheme-for-facade-shoring-works-at-block-4-in-central-police-station/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=temporary-traffic-management-scheme-for-facade-shoring-works-at-block-4-in-central-police-station</link>
				<pubDate>Wed, 01 Mar 2023 08:39:30 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Management]]></category>
		<category><![CDATA[Temporary Traffic Management Schemes ]]></category>
		<category><![CDATA[Arbuthnot]]></category>
		<category><![CDATA[Central]]></category>
		<category><![CDATA[Jockeyclub]]></category>
		<category><![CDATA[Ozzo]]></category>
		<category><![CDATA[Police]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[TTMS]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=852</guid>
				<description><![CDATA[Project Description: Block 4 is one of 16 historic buildings of Central Police Station (CPS). The recovery work for Block 4 comprises demolition works, steel façade shoring works and the main contract works. As Block 4 is located next to Arbuthnot Road, traffic on Arbuthnot Road will have to be properly managed during the process&#8230;]]></description>
								<content:encoded><![CDATA[<div class="x11i5rnm xat24cr x1mh8g0r x1vvkbs xdj266r x126k92a">
<div dir="auto"><span style="color: #003366;"><strong>Project Description: </strong>Block 4 is one of 16 historic buildings of Central Police Station (CPS). The recovery work for Block 4 comprises demolition works, steel façade shoring works and the main contract works. As Block 4 is located next to Arbuthnot Road, traffic on Arbuthnot Road will have to be properly managed during the process of recovery works, especially at the time of steel façade shoring erection works at eastern side ( next to Arbuthnot Road ). Temporary Traffic Management Scheme (TTMS) will be generally designed by <strong>Ozzo</strong> and the TTMS according to the guide lines given in TPDM (Transport Planning Design Manual) by Transport Department and Code of Practice for the Lighting, Signing and Guarding of Road Works by Highways Department.</span></div>
<div dir="auto">
<p>&nbsp;</p>
</div>
</div>
<div class="x11i5rnm xat24cr x1mh8g0r x1vvkbs xtlvy1s x126k92a">
<div dir="auto"><span style="color: #003366;"><strong>Projects: </strong>Temporary Traffic Management Scheme for Façade Shoring Works at Block 4 in Central Police Station</span></div>
<div dir="auto"><span style="color: #003366;"><strong>Project Type: </strong>Temporary Traffic Management &amp; Temporary Traffic Management Scheme</span></div>
<div dir="auto"><span style="color: #003366;"><strong>Project Year:</strong> 2020-2021</span></div>
<div dir="auto"><span style="color: #003366;"><strong>Client: </strong>Jockey Club CPS Limited</span></div>
</div>
<p><strong> </strong></p>
<p><img class="alignnone size-full wp-image-853" src="http://www.ozzotec.com/wp-content/uploads/2023/03/81965_Figure_A02_202101021.png" alt="" width="2382" height="1684" srcset="http://www.ozzotec.com/wp-content/uploads/2023/03/81965_Figure_A02_202101021.png 2382w, http://www.ozzotec.com/wp-content/uploads/2023/03/81965_Figure_A02_202101021-300x212.png 300w, http://www.ozzotec.com/wp-content/uploads/2023/03/81965_Figure_A02_202101021-768x543.png 768w, http://www.ozzotec.com/wp-content/uploads/2023/03/81965_Figure_A02_202101021-1024x724.png 1024w" sizes="(max-width: 2382px) 100vw, 2382px" /></p>
]]></content:encoded>
										</item>
		<item>
		<title>Provision of Consultancy service for Robotic System Testing in Tseung Kwan O Industrial Estate</title>
		<link>http://www.ozzotec.com/provision-of-consultancy-service-for-robotic-system-testing-in-tseung-kwan-o-industrial-estate/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=provision-of-consultancy-service-for-robotic-system-testing-in-tseung-kwan-o-industrial-estate</link>
				<pubDate>Thu, 12 Jan 2023 09:02:52 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Arrangement]]></category>
		<category><![CDATA[Temporary Traffic Management]]></category>
		<category><![CDATA[Temporary Traffic Management Schemes ]]></category>
		<category><![CDATA[HKPC]]></category>
		<category><![CDATA[Robot]]></category>
		<category><![CDATA[TIA]]></category>
		<category><![CDATA[TKO]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[TTMS]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=848</guid>
				<description><![CDATA[Project Description: Ozzo was commissioned to provide TTM Scheme and Traffic Impact Assessment Report for Robot System for the Placement and Collection of Traffic Cones and Lanterns in Road Works in Tseung Kwan O Industrial Estate. &#160; Projects: Provision of Consultancy service on design of TTM Scheme and Traffic Impact Assessment Report for Robotic System&#8230;]]></description>
								<content:encoded><![CDATA[<div class="x11i5rnm xat24cr x1mh8g0r x1vvkbs xdj266r x126k92a">
<div dir="auto"><span style="color: #003366;"><strong>Project Description:</strong> Ozzo was commissioned to provide TTM Scheme and Traffic Impact Assessment Report for Robot System for the Placement and Collection of Traffic Cones and Lanterns in Road Works in Tseung Kwan O Industrial Estate.</span></div>
<div dir="auto">
<p>&nbsp;</p>
</div>
</div>
<div class="x11i5rnm xat24cr x1mh8g0r x1vvkbs xtlvy1s x126k92a">
<div dir="auto"><span style="color: #003366;"><strong>Projects: </strong>Provision of Consultancy service on design of TTM Scheme and Traffic Impact Assessment Report for Robotic System Testing in Tseung Kwan O Industrial Estate</span></div>
<div dir="auto"><span style="color: #003366;"><strong>Project Type: </strong>Temporary Traffic Arrangement, Temporary Traffic Management &amp;  Temporary Traffic Management Schemes</span></div>
<div dir="auto"><span style="color: #003366;"><strong>Project Year:</strong> 2019-2021</span></div>
<div dir="auto"><span style="color: #003366;"><strong>Client:</strong> Hong Kong Productivity Council</span></div>
</div>
<p><img class="alignnone size-full wp-image-849" src="http://www.ozzotec.com/wp-content/uploads/2023/01/278693185_1732423817097925_7005386726422211309_n.jpg" alt="" width="810" height="540" srcset="http://www.ozzotec.com/wp-content/uploads/2023/01/278693185_1732423817097925_7005386726422211309_n.jpg 810w, http://www.ozzotec.com/wp-content/uploads/2023/01/278693185_1732423817097925_7005386726422211309_n-300x200.jpg 300w, http://www.ozzotec.com/wp-content/uploads/2023/01/278693185_1732423817097925_7005386726422211309_n-768x512.jpg 768w" sizes="(max-width: 810px) 100vw, 810px" /></p>
]]></content:encoded>
										</item>
		<item>
		<title>Contract No. C340B – Main Works for Barra Station, Macau LRT</title>
		<link>http://www.ozzotec.com/contract-no-c340b-main-works-for-barra-station-macau-lrt/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=contract-no-c340b-main-works-for-barra-station-macau-lrt</link>
				<pubDate>Thu, 12 Jan 2023 08:53:18 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Management]]></category>
		<category><![CDATA[Temporary Traffic Management Schemes ]]></category>
		<category><![CDATA[#Transportation]]></category>
		<category><![CDATA[BarraLRT]]></category>
		<category><![CDATA[C340B]]></category>
		<category><![CDATA[Macau]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[TRW]]></category>
		<category><![CDATA[TTMS]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=839</guid>
				<description><![CDATA[Project Description: Ozzo was asked to execute the temporary traffic management schemes (TTMS) and temporary road works (TRW) design required for the Barra Light Rail Station in Macau. It is now expected that the station will be completed and opened in 2023 Projects: Contract No. C340B – Main Works for Barra Station, Macau LRT Project&#8230;]]></description>
								<content:encoded><![CDATA[<div class="x11i5rnm xat24cr x1mh8g0r x1vvkbs xdj266r x126k92a">
<div dir="auto"><span style="color: #003366;"><strong>Project Description:</strong> Ozzo was asked to execute the temporary traffic management schemes (TTMS) and temporary road works (TRW) design required for the Barra Light Rail Station in Macau.</span></div>
<div dir="auto"><span style="color: #003366;">It is now expected that the station will be completed and opened in 2023</span></div>
<div dir="auto"></div>
</div>
<div class="x11i5rnm xat24cr x1mh8g0r x1vvkbs xtlvy1s x126k92a">
<div dir="auto"><span style="color: #003366;"><strong>Projects:</strong> Contract No. C340B – Main Works for Barra Station, Macau LRT</span></div>
<div dir="auto"><span style="color: #003366;"><strong>Project Type: </strong>Temporary Traffic Management &amp;  Temporary Traffic Management Schemes</span></div>
<div dir="auto"><span style="color: #003366;"><strong>Project Year:</strong> 2018-2021</span></div>
<div dir="auto"><span style="color: #003366;"><strong>Direct Client:</strong> China Construction Engineering (Macau) Co., Ltd.</span></div>
<div dir="auto"><span style="color: #003366;"><strong>Ultimate Client:</strong> Transportation Infrastructure Office, Macao</span></div>
<div dir="auto"></div>
</div>
<div class="x11i5rnm xat24cr x1mh8g0r x1vvkbs xtlvy1s x126k92a">
<div dir="auto"><a class="x1i10hfl xjbqb8w x6umtig x1b1mbwd xaqea5y xav7gou x9f619 x1ypdohk xt0psk2 xe8uvvx xdj266r x11i5rnm xat24cr x1mh8g0r xexx8yu x4uap5 x18d9i69 xkhd6sd x16tdsg8 x1hl2dhg xggy1nq x1a2a7pz xt0b8zv x1qq9wsj xo1l8bm" tabindex="0" role="link" href="https://www.facebook.com/hashtag/traffic?__eep__=6&amp;__cft__[0]=AZXPqKBjf3z38tg6SpBobubRqXb9stw7G_8Cg5VvVWgmJz5bSAWlgYhlllY8cj0OL4K5MtA2XwdMFng2uXUEW2BhQK2OWcdp7r9ysxPBMY0xEz7zBKEIB85gSrvAM5-qVQykCUq5PP-GSths0n8G3S8zlzR3qXuXp8xfJxpT6jXdZaMlsy1KepYU7kcHh6ILUnY&amp;__tn__=*NK-R"><img class="alignnone size-full wp-image-840" src="http://www.ozzotec.com/wp-content/uploads/2023/01/276314868_1717611201912520_284670289050037955_n.jpg" alt="" width="1440" height="350" srcset="http://www.ozzotec.com/wp-content/uploads/2023/01/276314868_1717611201912520_284670289050037955_n.jpg 1440w, http://www.ozzotec.com/wp-content/uploads/2023/01/276314868_1717611201912520_284670289050037955_n-300x73.png 300w, http://www.ozzotec.com/wp-content/uploads/2023/01/276314868_1717611201912520_284670289050037955_n-768x187.png 768w, http://www.ozzotec.com/wp-content/uploads/2023/01/276314868_1717611201912520_284670289050037955_n-1024x249.png 1024w" sizes="(max-width: 1440px) 100vw, 1440px" /></a></div>
</div>
<p>&nbsp;</p>
]]></content:encoded>
										</item>
		<item>
		<title>Contract No. DC/2010/03 &#8211; Kai Tak Nullah Improvement Works</title>
		<link>http://www.ozzotec.com/contract-no-dc-2010-03-kai-tak-nullah-improvement-works/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=contract-no-dc-2010-03-kai-tak-nullah-improvement-works</link>
				<pubDate>Fri, 29 Nov 2019 06:57:13 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Arrangement]]></category>
		<category><![CDATA[Temporary Traffic Management]]></category>
		<category><![CDATA[Temporary Traffic Management Implementation]]></category>
		<category><![CDATA[Temporary Traffic Management Schemes ]]></category>
		<category><![CDATA[Traffic Impact Assessment]]></category>
		<category><![CDATA[KaiTak]]></category>
		<category><![CDATA[PrinceEdwardRoadEast]]></category>
		<category><![CDATA[TIA]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[TTA]]></category>
		<category><![CDATA[TTM]]></category>
		<category><![CDATA[TTMS]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=557</guid>
				<description><![CDATA[Project Description: Ozzo is delighted to provide independent traffic consultancy services for Kai Tak Nullah Construction across Prince Edward Road East. The scope of work for this project include design of extensive Temporary Traffic Management Schemes (TTMS) and associated Traffic Impact Assessment (TIA) study. The scope of works include traffic data collection to facilitate traffic&#8230;]]></description>
								<content:encoded><![CDATA[<p><span style="color: #003366;"><strong>Project Description: </strong><span class="text_exposed_show">Ozzo is delighted to provide independent traffic consultancy services for Kai Tak Nullah Construction across Prince Edward Road East. The scope of work for this project include design of extensive Temporary Traffic Management Schemes (TTMS) and associated Traffic Impact Assessment (TIA) study. The scope of works include traffic data collection to facilitate traffic impact assessment of proposed TTMS, design of Temporary Traffic Arrangements and Traffic Management schemes to mitigate potential traffic impacts and to ensure vehicular/pedestrian safety during construction.</span></span></p>
<p><span style="color: #003366;"><strong>Projects: </strong>Contract No. DC/2010/03 &#8211; Kai Tak Nullah Improvement Works</span></p>
<div class="text_exposed_show">
<p><span style="color: #003366;"><strong>Project Type: </strong>Temporary Traffic Management &amp; Traffic Impact Assessment &amp; TTM Implementation<br />
</span></p>
<p><span style="color: #003366;"><strong>Project Year: </strong>2010-2015</span></p>
<p><span style="color: #003366;"><strong>Direct Client: </strong>Lam Construction Limited </span></p>
<p><span style="color: #003366;"><strong>Ultimate Client: </strong>Drainage Service Department</span></p>
<p><img class="alignnone size-full wp-image-558" src="http://www.ozzotec.com/wp-content/uploads/2019/11/P1000585_20190718.jpg" alt="" width="2048" height="1368" srcset="http://www.ozzotec.com/wp-content/uploads/2019/11/P1000585_20190718.jpg 2048w, http://www.ozzotec.com/wp-content/uploads/2019/11/P1000585_20190718-300x200.jpg 300w, http://www.ozzotec.com/wp-content/uploads/2019/11/P1000585_20190718-768x513.jpg 768w, http://www.ozzotec.com/wp-content/uploads/2019/11/P1000585_20190718-1024x684.jpg 1024w" sizes="(max-width: 2048px) 100vw, 2048px" /></p>
</div>
]]></content:encoded>
										</item>
		<item>
		<title>Replacement of the Traffic Control and Surveillance System in the Shing Mun Tunnels</title>
		<link>http://www.ozzotec.com/replacement-of-the-traffic-control-and-surveillance-system-in-the-shing-mun-tunnels/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=replacement-of-the-traffic-control-and-surveillance-system-in-the-shing-mun-tunnels</link>
				<pubDate>Fri, 08 Nov 2019 08:03:48 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Management Schemes ]]></category>
		<category><![CDATA[EMSD]]></category>
		<category><![CDATA[HyD]]></category>
		<category><![CDATA[ShingMunTunnel]]></category>
		<category><![CDATA[SurveillanceSystem]]></category>
		<category><![CDATA[TD]]></category>
		<category><![CDATA[TMLG]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[TrafficControl]]></category>
		<category><![CDATA[TTMS]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=545</guid>
				<description><![CDATA[Project Description: To assist with the replacement of the traffic control and surveillance system in the Shing Mun Tunnels, Ozzo provided extensive traffic consulting services which include design of all required temporary traffic management schemes and liaison closely with relevant authorities including the Transport Department, Hong Kong Police Force and Highways Department. Projects: Contract No. 1005EM11 –&#8230;]]></description>
								<content:encoded><![CDATA[<p><span style="color: #003366;"><strong>Project Description: </strong>To assist with the replacement of the traffic control and surveillance system in the Shing Mun Tunnels, Ozzo provided extensive traffic consulting services which include design of all required temporary traffic management schemes and liaison closely with relevant authorities including the Transport Department, Hong Kong Police Force and Highways Department.</span></p>
<p><span style="color: #003366;"><strong>Projects: </strong>Contract No. 1005EM11 – Replacement of the Traffic Control and Surveillance System in the Shing Mun Tunnels</span></p>
<div class="text_exposed_show">
<p><span style="color: #003366;"><strong>Project Type: </strong>Temporary Traffic Management Schemes </span></p>
<p><span style="color: #003366;"><strong>Project Year: </strong><span class="text_exposed_show">2012-2016</span></span></p>
<p><span style="color: #003366;"><strong>Direct Client: </strong>Unison Construction Engineering Ltd</span></p>
<p><span style="color: #003366;"><strong>Ultimate Client: </strong>Electrical and Mechanical Services Department</span></p>
<p><img class="alignnone size-full wp-image-546" src="http://www.ozzotec.com/wp-content/uploads/2019/11/VIDEO040720190718-163755.jpg" alt="" width="833" height="481" srcset="http://www.ozzotec.com/wp-content/uploads/2019/11/VIDEO040720190718-163755.jpg 833w, http://www.ozzotec.com/wp-content/uploads/2019/11/VIDEO040720190718-163755-300x173.jpg 300w, http://www.ozzotec.com/wp-content/uploads/2019/11/VIDEO040720190718-163755-768x443.jpg 768w" sizes="(max-width: 833px) 100vw, 833px" /></p>
</div>
]]></content:encoded>
										</item>
		<item>
		<title>Barra LRT Station in Macau</title>
		<link>http://www.ozzotec.com/barra-lrt-station-in-macau/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=barra-lrt-station-in-macau</link>
				<pubDate>Fri, 27 Sep 2019 04:22:52 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Management Schemes ]]></category>
		<category><![CDATA[#Transportation]]></category>
		<category><![CDATA[BarraLRT]]></category>
		<category><![CDATA[C340B]]></category>
		<category><![CDATA[LRT]]></category>
		<category><![CDATA[Macau]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[TRW]]></category>
		<category><![CDATA[TTMS]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=519</guid>
				<description><![CDATA[Project Description: Ozzo was asked to execute the temporary traffic management schemes (TTMS) and temporary road works (TRW) design required for the Barra Light Rail Station in Macau. The scope of work for this project included reviewing TTMS/TRW, undertaking traffic surveys as well as data collection as required. Projects: Contract No. C340B Barra LRT Station in Macau&#8230;]]></description>
								<content:encoded><![CDATA[<p><span style="color: #003366;"><strong>Project Description: </strong>Ozzo was asked to execute the temporary traffic management schemes (TTMS) and temporary road works (TRW) design required for the Barra Light Rail Station in Macau. The scope of work for this project included reviewing TTMS/TRW, undertaking traffic surveys as well as data collection as required.</span></p>
<p><span style="color: #003366;"><strong>Projects: </strong>Contract No. C340B Barra LRT Station in Macau</span></p>
<div class="text_exposed_show">
<p><span style="color: #003366;"><strong>Project Type: </strong> Temporary Traffic Management Schemes &amp; Temporary Road Works</span></p>
<p><span style="color: #003366;"><strong>Project Year:</strong> 2018-2019</span></p>
<p><span style="color: #003366;"><strong>Direct Client:</strong> China Construction Engineering (Macau) Co., Ltd.</span></p>
<p><span style="color: #003366;"><strong> Ultimate Client:</strong> Transportation Infrastructure Office, Macao</span></p>
<p><img class="alignnone size-full wp-image-520" src="http://www.ozzotec.com/wp-content/uploads/2019/09/1907061.jpg" alt="" width="1684" height="1190" srcset="http://www.ozzotec.com/wp-content/uploads/2019/09/1907061.jpg 1684w, http://www.ozzotec.com/wp-content/uploads/2019/09/1907061-300x212.jpg 300w, http://www.ozzotec.com/wp-content/uploads/2019/09/1907061-768x543.jpg 768w, http://www.ozzotec.com/wp-content/uploads/2019/09/1907061-1024x724.jpg 1024w" sizes="(max-width: 1684px) 100vw, 1684px" /></p>
</div>
]]></content:encoded>
										</item>
		<item>
		<title>Construction Works for Barra Section of Macau LRT</title>
		<link>http://www.ozzotec.com/construction-works-for-barra-section-of-macau-lrt/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=construction-works-for-barra-section-of-macau-lrt</link>
				<pubDate>Fri, 06 Sep 2019 03:39:14 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Management Implementation]]></category>
		<category><![CDATA[Traffic Impact Assessment]]></category>
		<category><![CDATA[#Transportation]]></category>
		<category><![CDATA[Barra]]></category>
		<category><![CDATA[LRT]]></category>
		<category><![CDATA[Macau]]></category>
		<category><![CDATA[Traffic]]></category>
		<category><![CDATA[TrafficStudy]]></category>
		<category><![CDATA[TransportationInfrastructureOffice]]></category>
		<category><![CDATA[TTMS]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=496</guid>
				<description><![CDATA[Project Description: Ozzo was highly involved in the planning and development process for the Macau Light Rail Transit Project of Barra Section. In addition to an initial traffic study performed in 2017, Ozzo worked on a traffic impact assessment to complement the well designed temporary traffic management schemes in order to minimize disruptions to existing roads/walkways.&#8230;]]></description>
								<content:encoded><![CDATA[<p><span style="color: #003366;"><strong>Project Description: </strong>Ozzo was highly involved in the planning and development process for the Macau Light Rail Transit Project of Barra Section. In addition to an initial traffic study performed in 2017, Ozzo worked on a traffic impact assessment to complement the well designed temporary traffic management schemes in order to minimize disruptions to existing roads/walkways.</span></p>
<p><span style="color: #003366;"><strong>Projects: </strong>Contract No.: C340 Construction Works for Barra Section of Macau LRT Phase I</span></p>
<div class="text_exposed_show">
<p><span style="color: #003366;"><strong>Project Type: </strong>Temporary Traffic Management Schemes &amp; Traffic Impact Assessment</span></p>
<p><span style="color: #003366;"><strong>Project Year:</strong> 2017-2018</span></p>
<p><span style="color: #003366;"><strong>Direct Client:</strong> Profabril Asiaconsult LDA</span></p>
<p><span style="color: #003366;"><strong> Ultimate Client:</strong> Transportation Infrastructure Office, Macao</span></p>
<p><img class="alignnone size-full wp-image-497" src="http://www.ozzotec.com/wp-content/uploads/2019/09/IMG_6862_new.jpg" alt="" width="2048" height="1536" srcset="http://www.ozzotec.com/wp-content/uploads/2019/09/IMG_6862_new.jpg 2048w, http://www.ozzotec.com/wp-content/uploads/2019/09/IMG_6862_new-300x225.jpg 300w, http://www.ozzotec.com/wp-content/uploads/2019/09/IMG_6862_new-768x576.jpg 768w, http://www.ozzotec.com/wp-content/uploads/2019/09/IMG_6862_new-1024x768.jpg 1024w" sizes="(max-width: 2048px) 100vw, 2048px" /></p>
</div>
]]></content:encoded>
										</item>
		<item>
		<title>Contract No. HY/2007/06 &#038; HY/2009/08 Tolo Highway/ Fanling Highway and Tuen Mun Road Project</title>
		<link>http://www.ozzotec.com/contract-no-hy-2007-06-hy-2009-08-tolo-highway-fanling-highway-and-tuen-mun-road-project/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=contract-no-hy-2007-06-hy-2009-08-tolo-highway-fanling-highway-and-tuen-mun-road-project</link>
				<comments>http://www.ozzotec.com/contract-no-hy-2007-06-hy-2009-08-tolo-highway-fanling-highway-and-tuen-mun-road-project/#respond</comments>
				<pubDate>Mon, 03 Jun 2019 09:33:01 +0000</pubDate>
		<dc:creator><![CDATA[TrafficKid]]></dc:creator>
				<category><![CDATA[Temporary Traffic Management Implementation]]></category>
		<category><![CDATA[Fanling Highway]]></category>
		<category><![CDATA[HY/2007/06]]></category>
		<category><![CDATA[HY/2009/08]]></category>
		<category><![CDATA[Tolo Highway]]></category>
		<category><![CDATA[TTA]]></category>
		<category><![CDATA[TTMS]]></category>
		<category><![CDATA[Tuen Mun Road]]></category>

		<guid isPermaLink="false">http://www.ozzotec.com/?p=308</guid>
				<description><![CDATA[Project Description: OZZO provided TTA services including TMA supplies. Project Type: Temporary Traffic Management Implementation Project year: 2013 Ultimate Client: Welcome Construction Co. Ltd.]]></description>
								<content:encoded><![CDATA[<p><span style="color: #003366;"><strong>Project Description:</strong> OZZO provided TTA services including TMA supplies.<br />
</span></p>
<p><span style="color: #003366;"><strong>Project Type: </strong>Temporary Traffic Management Implementation<strong><br />
</strong></span></p>
<p><span style="color: #003366;"><strong>Project year:</strong> 2013</span></p>
<p><span style="color: #003366;"><strong>Ultimate Client: </strong>Welcome Construction Co. Ltd.</span></p>
<p><span style="color: #003366;"><img class="alignnone wp-image-309 size-large" src="http://www.ozzotec.com/wp-content/uploads/2019/06/2-1024x342.jpg" alt="" width="1024" height="342" srcset="http://www.ozzotec.com/wp-content/uploads/2019/06/2-1024x342.jpg 1024w, http://www.ozzotec.com/wp-content/uploads/2019/06/2-300x100.jpg 300w, http://www.ozzotec.com/wp-content/uploads/2019/06/2-768x256.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></span><img class="alignnone wp-image-310 size-large" src="http://www.ozzotec.com/wp-content/uploads/2019/06/1-1024x768.jpg" alt="" width="1024" height="768" srcset="http://www.ozzotec.com/wp-content/uploads/2019/06/1-1024x768.jpg 1024w, http://www.ozzotec.com/wp-content/uploads/2019/06/1-300x225.jpg 300w, http://www.ozzotec.com/wp-content/uploads/2019/06/1-768x576.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
]]></content:encoded>
							<wfw:commentRss>http://www.ozzotec.com/contract-no-hy-2007-06-hy-2009-08-tolo-highway-fanling-highway-and-tuen-mun-road-project/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
							</item>
	</channel>
</rss>
