Temporary Traffic Arrangement at North Lautau Highway

Project Name: Temporary Traffic Arrangement at North Lautau Highway

Ultimate Client: Tarzan Landscape Contractors Ltd

Project Year: 2016-2017

Project Description:

A) TTM Design and Submission

i) Design of temporary traffic management schemes (TTMS) that would be required for two fast lanes closure to facilitate tree trimming works at North Lantau Highway and Airport Road.

ii) Prepare TTMS to be submitted for Transport Department (TD), Hong Kong Police Force (HKPF) and Highways Department.

iii)Undertake traffic surveys and data collection for the design of TTMS if required.

v) Obtain approval of the proposed TTMS and closely liaise with relevant authorities including Transport Department, Hong Kong Police Force, and Highways Department etc if required.

vi) Prepare draft traffic advice if required.

B) TTM Implementation

vii)   Supply, Install and remove of TTM as per the design in Item A, which installs traffic cones, traffic signs, Flashing Arrow Signs and FAS vehicle whenever necessary for transporting TTM materials.  Please note variable message sign is not included.

viii)   Visit RMO for applying for Road Work Advice

 

Tuen Mun – Chek Lap Kok Link Southern Connection Viaduct Link

Project Name: Tuen Mun – Chek Lap Kok Link Southern Connection Viaduct Link

Ultimate Client: Gammon Construction Limited

Project Year: 2016

Project Description:

i) Design of temporary traffic management schemes (TTMS).

ii) TTMS to be submitted for apprioval by Transport Department (TD), Hong Kong Police Force (HKPF) and Highways Department (HyD).

iii) Secondment of Traffic Engineer on working days to carry out drafting works.

iv) Attend maximum 24 times of Traffic Management Liaison Group (TMLG) meetings to resolve all aspects with respect to the TTMS for the Works.

v) Obtain approval of the proposed TTMS and closely liaise with relevant authorities including TD, HKPF and HyD.

vi) Meeting with TMLG, pre-TMLG, internal meetings with project team members.

Reconstruction and Improvement of Tuen Mun Road – Eastern Section

Junction Improvement
Road Widenning
Reconstrucion

 

 

Simulation of Footbridge Erection

 

Project Name: Reconstruction and Improvement of Tuen Mun Road – Eastern Section

Direct Client: Gammon Construction Limited, China State Construction Limited & China Harbour Engineering Limited

Ultimate Client: Highways Department

Project Year: 2011

Project Description: Independent Traffic Consultant for Contract No. HY/2007/09 – Reconstruction and Improvement of Tuen Mun Road – Eastern Section

Project Details: Ozzo is not only to Act as an Independent Traffic consultant to prepare TTM schemes, but also to Advise other traffic problems During the process of the construction work including Visibility Checking? with the Assistance of simulation presentation and to provide design for warning signing system where applicative.

KTE1002 – Kwun Tong Line Extension, Whampoa Station and Overrun Tunnel

Project Name: KTE1002 – Kwun Tong Line Extension, Whampoa Station and Overrun Tunnel

Direct Client: Chun Wo Construction & Engineering Co., Ltd.

Ultimate Client: MTRC

Project Year: 2011

Project Description: Independent Traffic Consultant for Providing  TTM design for Kwun Tong Line Extension, Whampoa Station and Overrun Tunnel During Construction

Contract No. DC/2010/03 Kai Tak Nullah Improvement Works

Project Name: Contract No. DC/2010/03  Kai Tak Nullah Improvement Works

Direct Client: Lam Construction Ltd.

Ultimate Client: Water Services Department

Project Year: 2010

Project Description: Provide Independent Traffic Engineer for the Design of TTA and Presentation in the TMLG Meeting

Contract No. 25/WSD/09 Replacement and Rehabilitation of Water Mains Stage 3 – Mains in Tsuen Wan and Kwai Tsing

Project Name: Contract No. 25/WSD/09 Replacement and Rehabilitation of Water Mains Stage 3 – Mains in Tsuen Wan and Kwai Tsing

Direct Client: Arbat Construction Co Ltd

Ultimate Client: Water Services Department

Project Year: 2010

Project Description: Independent Traffic Consultant for provide TTA design and Presentation in the TMLG Meeting and Independent Checking Engineer

DC/2009/11 – Tuen Mun Western Trunk Sewerage (Length – 2.5 km)

Project Name: DC/2009/11 – Tuen Mun Western Trunk Sewerage

Direct Client: Chun Wo Construction Ltd.

Ultimate Client: Drainage Services Department

Project Year: 2010

Project Description: Independent Traffic Consultant for provide TTA design and Presentation in the TMLG Meeting

Independent Checking Engineer for Tuen Mun Road

Project Name: Independent Checking Engineer for Tuen Mun Road

Direct Client: China Harbour Engineering Co. Ltd.

Ultimate Client: Highways Department

Project Year: 2009

Project Description: Provide Independent Checking on the TTA Implementation with Professional Certification

HY/2009/08 – Independent Traffic Engineer for Tolo Highway Widening Stage 1 Contract 2

Project Name: HY/2009/08 – Independent Traffic Engineer for Tolo Highway Widening Stage 1 Contract 2

Direct Client: Gammon Construction Ltd.

Ultimate Client: Highways Department

Project Year: 2010

Project Description: Provide Independent Traffic Engineer for the Design of TTA and Presentation in the TMLG Meeting

TTM Submission for Hoarding Erection at 19-27 Wyndham Street, Central

Project Name: TTM Submission for Hoarding Erection at 19-27 Wyndham Street, Central

Direct Client: Chun Wo Construction Ltd.

Ultimate Client: Private

Project Year: 2010

Project Description: Independent Traffic Consultant for provide TTA design and Submission to Government Departments