Complex BRT Network Study in Macao

Project Name: Complex BRT Network Study in Macao

Ultimate Client: Transport Bureau – Macao

Project Year: 2012

Project Description: To Study the Routing Network for Bus Rapid Transit System in Macao

Project Details: In Order to Solve the Envisaged Demand of Transportation between Taipa and Macao, a Comprehensive Study is to be conducted by the Local Authority in Association with OZZO Technology to find out the Desirable BRT Routes for Serving University of Macao and the Large Scale Residential Development in Taipa. This Study will Provide Route Choise Proposals with comprison and Related Preliminary Design of Civil Works.

Road Design in Tsz Tin Tsuen

Project Name: Site Formation and Infrastructural

Ultimate Client: Works in Area 54

Project Year: 2012

Project Description: Site Formation, Roads and Drains Construction Work
Project Details: This is a Project Including Site Formation Works, Box Culrest Construction, Road works Design and Construction in order to Facilitate a Future Residential Development.

Development of the Second Mid-Levels Escalator in Central District

 

Project Name: Development of the Second Mid-Levels Escalator in Central District

Ultimate Client: Central & Western District Council

Project Year: 2011

Project Description: To Study the Possible Locations and Alignments of New Escalator and to Forecast Future Pedestrian Demand on New Escalator.

Project Details: The Main Study Objective is to study and Find out the Best Location and Alignment for Implimenting the Second Mid-Levels Escalator System. In the Study, the proposed Alignment of the 2nd Mid-Level Escalator System is also Proposed for Consideration. Other than the Alignment Design, Pedestrian Interview Surveys are Required for Analysis and Modelling in order to Justify the Demand of 2nd Escalator System in Mid-Levels.

Accepted Alignment Proposal

 

Associated Design Porposal

Swept Path Analysis on Access Road in HK Airport

Project Name: Swept Path Analysis on Sky City Road

Direct Client: China Light and Power

Ultimate Client: China Light and Power

Project Year: 2011

Project Description: To Provide Professional Checking on Internal Roads and Prepare Swept Path Analysis with 3D presentation.

Street Lighting Design for Castle Peak Road

 

Section Showing Lighting Arrangement

 

Project Name: Street Lighting Design for Castle Peak Road – San Tin Road Widening works

Direct Client: Honour Hall Engineering Co.

Ultimate Client: Highways Department

Project Year: 2009

Project Description: To design temporary and permanent lighting for Highway.

Project Details: The Scope of work to be Undertaken in this Projects is to Provide Traffic Advise During the Reconstruction and Realignment of a particular Section of Castle Peak Road and to Provide  Temporary and Permanent Road Lighting Design and Calculations with Installation Details for the Realigned of Castle Peak Road.

Design of Delivering Route for Explosive Material Delivery

 

Project Name: Design and Impact Study on Delivering Route for Explosive Inaterial

Direct Client: BMT Asia Pacific

Ultimate Client: Drainage Services Department

Project Year: 2008

Project Description:  A traffic study has been carried out to evaluate the delivery route of the explosive materials and the affected population. To Design a delivery Route for Delivering Explosive Material during Construction Stage and Evaluate the Impact that Miflit  Happen during the Journey of Delivery.

Speed Limit Modification Feasibility Study

Road Alignment Review on Existing Road

Road Alignment Review on Existing Road

Speed and Visibility Presentation by Simulation

Project Name: Speed Limit Modification Feasibility Study

Direct Client: Civil Assets Management

Ultimate Client: China Light and Power

Project Year: 2008

Project Description: To carry out Traffic study due to the change of speed limit at Yong Long Road and to provide traffic engineering scheme with details design.

Design of Contingency Measure for Visitors During Featival Days

Project Name: Yuen Yuen Institute Contingency Measure for Pedestrian

Direct Client: BMT Asia Pacific

Ultimate Client: Yuen Yuen Institute

Project Year: 2008

Project Description: To Investigate the Travelling Pattern of Pedestrian and Visitors during Festival Days, and to Design a Contingency Measure Over Crowded Visitors or Pedestrian.

Design of Pedestrian Walkway System and Signs

Project Name: Cross River Pedestrian Bridge

Direct Client: WT Engineering Construction Co.

Ultimate Client: Civil Engineering Development Department

Project Year: 2007

Project Description: Carry out Design for Temporary Pedestrian Walkway/Bridge and Related Directional Traffic signs in New Town Area.

Additional Vehicular Access in Airport

Project Name: Additional Vehicular Access for HAECO in Airport

Direct Client: Civil Asset Management

Ultimate Client: HAECO

Project Year: 2007

Project Description: Carry out Feasibility Study, Detailed  Design of Roads and Drains for the Additional Vehicular Access at South Perimeter Road in Airport.